Traffic Conditions

Traffic Conditions for New York, NY

Mapimage?mapdata=obdvied6wxxcsvrxwtn6zzeq0r0uwoosn4wmwzeo5udczmp

incident

Severity: 2 Direction: WB Report date: January 27, 2006 14:10 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

As of January 3, 2010 the 2004 restriction that prohibited 2 axle and 3 axle single unit trucks from using the eastbound tunnel to New York was lifted. All 4, 5 axle and 6 axle trucks as well as all 3 axle dual unit trucks, trailers and towed vehicles remain restricted from using the tunnel in both directions. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance.

Mapimage?mapdata=dx0oo

incident

Severity: 2 Direction: EB Report date: January 27, 2006 14:10 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

As of January 3, 2010 the 2004 restriction that prohibited 2 axle and 3 axle single unit trucks from using the eastbound tunnel to New York was lifted. All 4, 5 axle and 6 axle trucks as well as all 3 axle dual unit trucks, trailers and towed vehicles remain restricted from using the tunnel in both directions. One of two lanes will be closed westbound to New Jersey Sunday nights to Friday mornings from 11:30pm to 5:30am, and 12:01am to 8am Saturday mornings. These lane closures are required to facilitate PANY amp;NJ construction activity and maintenance.

Mapimage?mapdata=l0kjdud6wxuqy84uuzqg2bkfxuuxkkmqdo8ajmqj6nbzhxfspeoanti

construction

Severity: 2 Direction: EB Report date: December 30, 2005 13:16 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

One of three lanes may be closed in eastbound direction to Brooklyn as needed 10am to 3pm weekdays, 11pm to 6am Monday to Friday and Saturday and or Sunday 2am to 2pm. One of three lanes may be closed westbound 10am to 3pm Monday to Friday and 11pm to 6am Sunday nights to Friday morning, 1am to 7am Saturday and 1am to 9am Sunday. These lanes will be closed as needed to facilitate the Brooklyn Bridge approach ramps and painting capital project through April 2014. As of July 12, 2010 for approximately four weeks two of three lanes may be closed westbound 11pm to 6am Sunday nights to Friday morning and 2am to 6am Saturday and Sunday.

Mapimage?mapdata=g9jb7ed6wxxvnct7ka0q1hrslww0db_wpczjn5knhizynybzuthlnl_xxqtcuzmxcuxhipz6bfeovssdpc9xparh8m22jfcpvfuf3kzq2epgdiub8r6pfe0mr6h9qjrlrnedi0aa6baqtzcsnkznwsvk

incident

Severity: 2 Direction: EB Report date: September 28, 2007 13:07 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

There are five lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and three on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . One lane on the lower roadway may be closed, as needed, 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 5am the next day, there are five lanes eastbound and two lanes westbound. There are five lanes westbound to Manhattan and two lanes eastbound to Brooklyn over the weekend from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times. One lane on the lower roadway is closed as needed. Lane closures may occur on off peak hours weekdays, weekends and overnight for maintenance and construction activity for NYCDOT bridges as needed basis through June 2013.

Mapimage?mapdata=

construction

Severity: 2 Direction: WB Report date: March 19, 2010 17:57 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

One of three lanes may be closed in eastbound direction to Brooklyn as needed 10am to 3pm weekdays, 11pm to 6am Monday to Friday and Saturday and or Sunday 2am to 2pm. One of three lanes may be closed westbound 10am to 3pm Monday to Friday and 11pm to 6am Sunday nights to Friday morning, 1am to 7am Saturday and 1am to 9am Sunday. These lanes will be closed as needed to facilitate the Brooklyn Bridge approach ramps and painting capital project through April 2014. As of July 12, 2010 for approximately four weeks two of three lanes may be closed westbound 11pm to 6am Sunday nights to Friday morning and 2am to 6am Saturday and Sunday.

Mapimage?mapdata=uu6aiod6wxusxcqdq2t1xjwqecr2a8y9rxv3vs8k3lrc2y92s7bvre5v9y

incident

Severity: 2 Direction: WB Report date: October 19, 2007 14:05 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

There are five lanes from 6am to 10am Monday to Friday westbound Manhattan bound of which two are on the north upper roadway the left lane HOV2 and three on the lower roadway; two lanes are maintained on the south upper roadway eastbound Brooklyn bound . One lane on the lower roadway may be closed, as needed, 10am to 3pm Monday to Friday. No trucks are permitted on the North Upper westbound roadway from 5am to 3pm Monday to Friday. Overnight Monday to Friday from 3pm to 5am the next day, there are five lanes eastbound and two lanes westbound. There are five lanes westbound to Manhattan and two lanes eastbound to Brooklyn over the weekend from 9pm Friday to 10am Monday. The north bikeway is open, and the south walkway open at all times. One lane on the lower roadway is closed as needed. Lane closures may occur on off peak hours weekdays, weekends and overnight for maintenance and construction activity for NYCDOT bridges as needed basis through June 2013.

Mapimage?mapdata=egmy

construction

Severity: 1 Direction: EB Report date: December 30, 2005 13:16 Update date: July 30, 2010 10:23 End date: July 31, 2010 10:23

There are four lanes westbound Manhattan bound and two lanes eastbound Brooklyn bound with two lanes closed for construction in the off peak direction weekdays from 6am to 10am. Weekdays from 10am to 3pm there are three lanes maintained inbound, and two lanes maintained for traffic outbound with three lanes closed for construction activity. There are four lanes eastbound and four lanes westbound all other times. These off peak hour lane closures are required as needed to facilitate NYCDOT bridge maintenance and rehabilitation work through June 2010. Truck traffic is allowed on the bridge in both directions on the outer roadways only. Pedestrian and bicycle access maintained at all times. The south inner roadway and one of two lanes on the south outer roadway to Brooklyn eastbound will be closed 3AM to 3PM Saturday and Sunday July 24th and 25th. During these hours trucks will be restricted eastbound and should plan alternate routes over the Manhattan Bridge.

Processing your request... Please wait.